Call Now
PRODUCTS

Work Cell Staging Rack

Stop wasting valuable floor space and start going vertical!

The Work Cell Staging Rack makes it easy to visually organize your work-in-progress parts. You’ll instantly free up the space you need to stage next jobs and minimize movement of parts and materials. The rack will pay for itself as you improve workflow and efficiency in your manufacturing facility.

The tower’s small footprint lets you comfortably stack 16 pallets in the space usually used for one. A dual side-by-side version fits 32 pallets in the typical space of two. When all current jobs are staged in the assigned tower, you can easily see whether a work cell is busy or vacant. We suggest a cartridge tower near every department or each machine, depending on your facility and workload. 40″ x 48″ or other customizable configurations.

Product rendering of the LEAN Work Cell staging rack for in-progress tasks
Tap image to magnify
STYLES

No items found.
FAQ

Q: What Is Standard Sizing And Height for work cell staging racks?

The reusable steel cartridges are typically designed to match a standard 40×48 pallet size. Height spacing is determined per order to best suit our customer’s needs.

Height typically ranges between 10’ and 14’, depending on your ceiling and/or forklift constraints.

Q: Are Specs And Spacing Adjustable Per The Customer’s Needs?

Yes! We base specs off of our customer’s needs. We know that our customers get the most functionality and efficiency when we design projects specifically for them.

Q: What Is The Load Rating Per Shelf?

Typically, the load rating is 3000 lbs. per shelf evenly distributed. If a different load rating is required, reach out to us and we can discuss what we can do to accommodate your needs.

Q: How Is The Rack Assembled?

The racks are shipped in a series of flat panels (side walls & back wall) that are stood up and joined together with supplied hardware.

They can be assembled using either an overhead crane or a forklift – typically customers do not use any outside rigging services, but we’re happy to point you in the direction of local companies if you need assistance.

Rule of thumb is 2-3 hours for 2-3 operators for the first unit, and 1-2 hours for each additional unit after that.

Q: What Is The Lead Time?

Typically, 5-7 weeks is the standard lead time for the WIP Staging racks.

Q: What Is The Footprint Of The Rack?

Contact us and we are happy to supply you with footprints for the rack. Since each project can be slightly different, we prefer to provide footprints as our customers request them.

Q: Do You Have Any CI Recommendations That Are Complementary To The WIP Staging Racks And Efficiently Storing Blanks?

Magnets for labeling the steel cartridges.

Job folders on side of rack to identify which job is staged in each individual cartridge.

DISCOVER YOUR LEAN SOLUTIONS.

By clicking “Accept”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy Privacy Policyfor more information.